The basement demolition is, as stated in the title, complete. We have a pump now that I have been assured will keep the basement dry during anything short of a Biblical flood. I’m trying to be optimistic about that.
The reconstruction will be in three phases. The first phase is wall reconstruction and painting which will start in about a week and take probably 5-7 days. Second phase is floor reconstruction which will take place at some point after the wall reconstruction and probably won’t take more than 2 days (if that). Third phase is unpacking which will start after the floors are done and take as long as it takes. I’m hoping that everything will be done by the end of October.
In other aspects of my life, the fatigue from my treatments is running roughshod. Last night I slept until I couldn’t sleep anymore and I’m still exhausted. I went downstairs to survey the wreckage and start making preliminary plans for reconstruction and that took all the energy I had. It’s really a good thing that I only have two more of these weekly treatments. I’ve missed two days of work this week and I’ll just have to see how I feel tomorrow.
It is enormously frustrating. I take stock of all the activities I’ve done over the last two days and the list is not long. At all. Somehow, though, I don’t have enough energy to do anything more and, while one part of my brain knows what is going on and understands, the other part of my brain will not shut up about how lazy I’m being.
As I believe I’ve mentioned, sometimes my brain is not particularly helpful.